I just noticed my tunnel is cracked, there is a tall vertical pit (Not sure how to call it in english) around the footwell area with about 1 inch crack at the bottom. I have no idea how long I am riding with it also I am not sure what caused it
I am planning to replace the whole tunnel but I do not understand which parts need to be ordered. I looked into parts diagram,
"Chassis, Chassis Asm. & Over Structure All Options"
there are two parts numbers relating to the tunnel, which one do I Need? Hopefully not both as they both cost over $3000 and it is hard to believe that the tunnel alone could cost over $3000. Can someone help me with that?
2204910-1361 11KIT, MY14 6/8 PRO 155 RMK CHASSIS, NAT [+]
1018868-1361 11ASM., TUNNEL, 155 SERVICE, NAT/MBLACK
also, is the tunnel and bulkhead connected with screws only? or also glue? wondering if I need to order glue. Do I need to remove engine to separate bulkhead from the tunnel? any hints appreciated
I am planning to replace the whole tunnel but I do not understand which parts need to be ordered. I looked into parts diagram,
"Chassis, Chassis Asm. & Over Structure All Options"
there are two parts numbers relating to the tunnel, which one do I Need? Hopefully not both as they both cost over $3000 and it is hard to believe that the tunnel alone could cost over $3000. Can someone help me with that?
2204910-1361 11KIT, MY14 6/8 PRO 155 RMK CHASSIS, NAT [+]
1018868-1361 11ASM., TUNNEL, 155 SERVICE, NAT/MBLACK
also, is the tunnel and bulkhead connected with screws only? or also glue? wondering if I need to order glue. Do I need to remove engine to separate bulkhead from the tunnel? any hints appreciated
Last edited: